Compost Powder fertilizer Making Machine
Carbonaceous materials mainly derived from plants and/or animals and applied to the soil to provide plant nutrition as their main function. Processed from biological materials, animal and plant wastes, and plant residues, the toxic and harmful substances are eliminated, and it is rich in a large number of beneficial substances, including: a variety of organic acids, peptides, and abundance including nitrogen, phosphorus, and potassium Of nutrients. It can not only provide comprehensive nutrition for crops, but also has long fertilizer efficiency, which can increase and renew soil organic matter, promote microbial reproduction, and improve soil physical and chemical properties and biological activity. It is the main nutrient for green food production.
The main requirements are organic matter content greater than 45%, total nitrogen, phosphorus and potassium nutrients greater than 5%, effective viable bacteria number (cfu), 100 million/g ≥0.2, and powder moisture less than 30%. PH5.5-8.0, the water content of the particles ≤20%.
3000-5000MT/Y, 10000MT/Y, 30000MT/Y, 50000MT/Y, 100000MT/Y, 200000MT/Y
Compost Powder Fertilizer Production Line is also called Compost Sorting and Separating Line, it can be either one powder fertilizer line or combined with the granules line to compose a complete organic fertilizer production line. It has the following equipment:
1. feeding silo
2. organic fertilizer crusher like wet hammer crusher or chain crusher
3. sorting or sifter or screening machine
4.packing machine
5. robot pallet system
MACHINE PICTURES IN DETAILS
FINAL COMPOST POWDER FERTILIZER
CARGO DELIVERY
LOOK FORWARD TO YOUR COOPERATION!
SPECIFICATIONS
Item | Organic Pellet Fertilizer Production Line | ||||||
capacity | 3000mt/y | 5000MT/Y | 10000mt/y | 30000mt/y | 50000mt/y | 10000mt/y | 20000mt/y |
Area suggested | 10x4m | 10x6m | 30x10m | 50x20m | 80x20m | 100x2m | 150x20m |
Payment terms | T/T | T/T | T/T | T/T | T/T/LC | T/T/LC | T/T/LC |
Production time | 15 days | 20days | 25 days | 35 days | 45days | 60 days | 90 days |
Working Site
Customer Visit